Washington Mutual Bank
Lighting Upgrades

  1. Washington Mutual Bank (BTE/EMCOR)
  2. Financial Institutions
  3. January 2002 thru 2003
  4. 500 locations in 9 states
  5. $4,000,000 in lighting upgrades
  6. 40,000+ light fixtures and 1350 kW reduced

Project Overview and Technical Scope:

Utilities Dynamics was hired by Washington Mutual Bank & BTE-Emcor to develop and implement energy efficient lighting strategies within their facilities. Washington Mutual’s goal was to reduce overall energy consumption within their facilities by 10% for 2002 and an additional 10% by the year 2004. Another goal of the bank was to contract with women owned contractors for 30% of the total contract amount. Utilities Dynamics was one of two approved contractors that met this requirement for their on-going energy reduction program.

  1. Utility rebate coordination
  2. Development of scopes of work. Visit approved sites and collect detailed site information on existing lighting systems.  Develop design criteria’s and scopes of work. Review scope development with WAMU/EMCOR for approval to proceed. 
  3. Reporting information via web based database.
  4. Project Management
  5. Material procurement and scheduling of assigned crews.
  6. Labor/installation of site approved recommendations.
  7. Coordination of lamp and ballasts recycling.
  8. Post installation walkthroughs and commissioning.